Reply to thread

Once the steering is on the axle, then I’ll focus on the links. 


Once links are done, I’ll work on driveshaft and possible addition of a carrier bearing and going to a 2 pc front shaft or not. 


This will determine whether I use 14 or 16” shocks.  Going for 7” minimum uptravel and as much droop as the driveshaft will allow.


Loading…
Back
Top