Floor patch fitting and under cab cleanup underway in earnest. I ordered the C2C XJ front halves quite a while back, before Keyparts started making the MJ versions. So I knew there would be more than minor modification to make them work. I did get the Keyparts longitudinal floor support, so there's that at least, for the section I need. Driver's side main panel is almost done. Made a template for the section above it, so much rot from the previous clutch master.
[ATTACH=full]426265[/ATTACH]
Still some weld-through primer prep to do on the bottom side, but it's close to ready.
[ATTACH=full]426268[/ATTACH]
Cab bottom side- A blunt flat blade screwdriver to remove the overburden of crud and old undercoat, followed by a generous wash with odorless mineral spirits.
[ATTACH=full]426266[/ATTACH]
[ATTACH=full]426267[/ATTACH]