- Joined
- Mar 20, 2005
- Location
- Hendersonville, NC
Here is Supervan. This is the newest van to be built by us at U Joint Offroad. This customer from Florida called us looking for an all inclusive build that he can travel in, wheel and explore South America in.
This one's getting our 6" lift, new 60 front, 4.10's, ARB rear and Tru-Trac front. Rebuilt 4R110, NV271, onboard air and water, 16.5k winch, dual swing out carriers(one tire and the other a generator) and a bunch of other goodies.
You can see so far the suspension is done, gears are done, frame crossmembers are in and the onboard air and water mount/skid is nearly completed.
I'll update the build over the nest few days. Check out our website for more info and some great videos.
Here's how we got it last week.
The start of the front suspension hangers
Front 60 is in. 100% new from hub to hub. 4.10's and a Tru Track
Rear 60 hung, suspension done. This was just before I finished up the ARB install.
Here is the start of the onboard air and water mount/skidplate. You can also our frame crossmembers installed for additional reenforcement in the frame.
Finally at the current stopping point awaiting the tranny/transfer case and some skid material.
More to come in the next few days.
This one's getting our 6" lift, new 60 front, 4.10's, ARB rear and Tru-Trac front. Rebuilt 4R110, NV271, onboard air and water, 16.5k winch, dual swing out carriers(one tire and the other a generator) and a bunch of other goodies.
You can see so far the suspension is done, gears are done, frame crossmembers are in and the onboard air and water mount/skid is nearly completed.
I'll update the build over the nest few days. Check out our website for more info and some great videos.
Here's how we got it last week.
The start of the front suspension hangers
Front 60 is in. 100% new from hub to hub. 4.10's and a Tru Track
Rear 60 hung, suspension done. This was just before I finished up the ARB install.
Here is the start of the onboard air and water mount/skidplate. You can also our frame crossmembers installed for additional reenforcement in the frame.
Finally at the current stopping point awaiting the tranny/transfer case and some skid material.
More to come in the next few days.