Reply to thread

Need it spread over the area grading guy will create tomorrow... basically 60' long going straight back thru the fence/gate and tapering out to about 20'-25' about halfway back). Grader said a "good driver" can spread it almost to the point a little raking will be all that's needed, but said he'd bring the bobcat back to smooth it out if needed... the plan is to "edge" where the gravels are going, so it and eventual grass around it will be the same grade.


Didn't want just plain gravel as it's prone to spinning out from under loaded towrig tires... figured the road bond/crush&run would lock itself together and be dang hard like concrete (but allowing the water to pass).


TIRED OF MUD!


Loading…
Back
Top