Reply to thread

You will very much need additional ducts.


And if SC is anything like NC, you will need another return as well. Anything over 1600sq ft is required by code to have at least 2 returns.


And I don’t know that I see a jack stud under the header on that door to the right?  Could be the angle of the picture.


Loading…
Back
Top