There seem to be a million companies out there, how have you all gone about choosing one? I need to keep it under $10k and I have few ways of taking short cuts with some stuff like the electrical,assembly and grading.
I'm not even sure what size exactly I need but I have to have two bay doors and a large work/storage area off to the side preferrably.
Thanx for the input, .....Rigless for '06 Josh
I'm not even sure what size exactly I need but I have to have two bay doors and a large work/storage area off to the side preferrably.
Thanx for the input, .....Rigless for '06 Josh