Blaze
The Jeeper Reaper
- Joined
- Aug 9, 2005
- Location
- Wake Forest, NC
So I have an issue with what I am working on in my house. When they were building my house it was supposed to be a 2-story house, but they finished the downstairs and never did any work upstairs. As such, the upstairs is now classified as attic space. My house plans say the "primary dwelling" has a 40# live load, which they are saying I need for upstairs, but the attic (limited storage) is only 20# LL so they are saying it isn't enough for habitable space and I need to have an engineer evaluate the floor.
I have no idea how to go about finding one or how much it costs. If it is going to be too expensive I'll just say fuck it. Really wish they would have just finished off the damn upstairs when they built the fucking house.
I have no idea how to go about finding one or how much it costs. If it is going to be too expensive I'll just say fuck it. Really wish they would have just finished off the damn upstairs when they built the fucking house.