I just saw the damndest thing...

kaiser715

Doing hard time
Joined
Jun 1, 2006
Location
7, Pocket, NC
Just met 3 trucks on nc-42 carrying concrete beams for the new bridge over the deep river.

They were BACKING from us-1 to the river, about 10 miles. I talked to a gal driving a flag car. She said they (engineers, permit folks, whoever) made them do it that way.

Beams aren't that long, and there are plenty of places to turn around. And lesser used roads that are shorter, just as wide, and straighter.

I met 3 just like this
c9c9337ae150acddea8c8ea6c8df2b11.jpg


Sent from my SM-G930V using Tapatalk
 
Last edited:
This has to be a government run operation
 
At a bare minimum put the truck in neutral hook a truck and a chain up and drag that whole shooting match. For God's sake dont give the driver neck strain.
 
I just came back out to the house. Last truck was up to the 42/Pickard Road intersection, so it made 2.2 miles in 2-1/2 hours.


Here is the google traffic map for this cluster:

route.png
 
Maybe because it was the way that they had to unload them? But it's hard to believe that there was NO turn around any closer?
 
Or that giant intersection at plank rd.



Sent from my SM-G930V using Tapatalk


That's the one I was looking at. They should have been able to turn around there, especially with pilot cars to stop traffic.

I'm waiting for somebody to come along and drop some knowledge on us....
 
Wife was home but I guess she missed the giant truck driving in reverse in front of the house.

Sent from my LG-H872 using Tapatalk
 
DOT route planners are stupid. I got 3 cranes last year from Edwards. DOT routed 2 of them down the dead end road by work. DOT dead ended the road, it's on their maps, and they still sent them down it. 2 trucks full of rigging and counter weights along with a crane towing a truck were a lot of fun to get backed up the road.
 