- Joined
- Mar 17, 2005
- Location
- N. N. Raleigh, NC
Work from the other night, doesnt look like a whole lot, but its the ground work for other things, one more tube started and the other side just needs to be welded on.. Plates on both inside and out sandwhich the tub. Inside will tie to main cage (eventually). Needed this done to hold front end wiring, shocks, brake stuff etc...

had to switch to a single due to drive shaft issues up front and fuel tank issues under the tub... part of the crossover is done waiting on some ram horns ive got on order...

