- Joined
- Jun 19, 2007
- Location
- high point
Hi Everyone – I went out to Falls Dam today. Here’s the updated notes.
At Falls Dam Trail – I put up yellow pin flags to follow and a pink flag to mark site A.
Falls Dam Trail – Look for yellow pin flags and pink flagging at the top of Falls Dam Trail about ¼ mile down the trail for the Falls Dam/Art Lilley THs.
A = Install 4 long rails & 5 posts. The rails are on site already but the posts are not. This is being installed on the inside curve of where the large mud hole used to be in the first curve in the trail as you start going off the ridge and downhill. There are 4 long rails to install there. There are 4 posts stuck in the ground that need to be jacked up out of the ground and reused. You’ll need to take 2 new posts up there and reuse the 4 posts that are there. One of the posts you’ll take up is to be installed in the long section of guard rail that is installed is missing one post – you’ll see the sag in the GR to put it in. Add only ‘No Vehicle’ signs behind the GR at this time.
B = Install 2 long rails & 3 posts in the break in the split rail fencing. (no flagging here). This is about ¼ to ½ mile up the trail from the Flatwoods TH. There are 2 rails on site & I think one posts. Take 3 posts so you have enough. Add ‘No Vehicle’ & ‘No Camping Here’ signs behind the GR & split rail fencing.
Snappy – let us know who’ll be in charge of the 2 to 3 groups.
Thanks a lot. Bye - Terry
This is from Terry
At Falls Dam Trail – I put up yellow pin flags to follow and a pink flag to mark site A.
Falls Dam Trail – Look for yellow pin flags and pink flagging at the top of Falls Dam Trail about ¼ mile down the trail for the Falls Dam/Art Lilley THs.
A = Install 4 long rails & 5 posts. The rails are on site already but the posts are not. This is being installed on the inside curve of where the large mud hole used to be in the first curve in the trail as you start going off the ridge and downhill. There are 4 long rails to install there. There are 4 posts stuck in the ground that need to be jacked up out of the ground and reused. You’ll need to take 2 new posts up there and reuse the 4 posts that are there. One of the posts you’ll take up is to be installed in the long section of guard rail that is installed is missing one post – you’ll see the sag in the GR to put it in. Add only ‘No Vehicle’ signs behind the GR at this time.
B = Install 2 long rails & 3 posts in the break in the split rail fencing. (no flagging here). This is about ¼ to ½ mile up the trail from the Flatwoods TH. There are 2 rails on site & I think one posts. Take 3 posts so you have enough. Add ‘No Vehicle’ & ‘No Camping Here’ signs behind the GR & split rail fencing.
Snappy – let us know who’ll be in charge of the 2 to 3 groups.
Thanks a lot. Bye - Terry
This is from Terry