November workday dates?

Yes. This will be the last scheduled workday for this year before the trails close. During the winter months while the trails are closed we have them to ourselves but still work on them. Get way more work done then also.
 
Hi Everyone – Sorry about the late email about this month’s volunteer workday. We’ll be continuing our barricading illegal trails that come off of Dickey Bell Trail and we’ll be installing “No vehicles beyond this point” signs where we put up the barricades.


Meet at the Uwharrie Hunt Camp at 9 am this Saturday, Nov 15th. We’ll need vehicles that can haul / drag guardrail up to Dickey Bell Trail to the rocky hill climb and that an haul the posts up there too. We have 5 or 6 guardrails placed along the trail that need to be installed so we’ll be taking extra posts for them. Bring ratchet sets or drills, rock bars, chains & cables to haul the guardrail up, shovels, work gloves & boots, lunch and water.


Thanks a lot for your continued help with the OHV Trails so that we can keep the system open.


Bye - Terry
 
I'm afraid I'm not going to be able to make it tomorrow, but I should be back out a few more times before the park closes - if there is anything in particular I can do when I'm there (something you can't finish tomorrow, something to prep for December's work day) feel free to let me know.

Shaggy
 
There is no December workday on the calendar. My club is doing one on the 6th though if you or anyone would like to join. Be around a bunch of Cruiser heads though.
 
Please make sure all folks coming out are prepared for cooler weather. Highs are going to be in the 40's from what I have seen.
 
Back
Top