Random pic thread.

I think you’re going to need a lot more cribbing.


That was at lunchtime, had it raised about 24"....but yea it took a pile to get it done.

20260910_095736.jpg
 
what happens if it's out of square if/when you get to desired height?

how did you raise it? Pole jacks? 30 Amish men on each size?

We had 6 hydrauilic jacks going at the same time setup in the cribs. Lift it 6"-8" at a time, set the blocks,reset the jacks. Repeat all day. I doubt there was any latereral movement....if there was it minimal. Block man should be able to plumb down from the corners and keep it close.

Its funny you mentioned Amish, he actually owns an Amish furniture store. I asked him if he was bringing any of his vendors down to help us
 
I doubt there was any latereral movement....if there was it minimal. Block man should be able to plumb down from the corners and keep it close.
Sure there was lateral movement. Unless all of the cribbing and jacks were perfectly square, which you know they weren't. And yeah, it could be close enough. I'd be curious to see how close it really stayed.
 
Sure there was lateral movement. Unless all of the cribbing and jacks were perfectly square, which you know they weren't. And yeah, it could be close enough. I'd be curious to see how close it really stayed.

It sure within hillbilly standards for a roof raise +/- 2" 😅 ......now im curious.
 
Last edited:
Back
Top