Lighter for now anyway! The whole reason for starting this was that it was so hard to get to everything. Everytime someone broke, I have to climb, wrestle, unstrap, dig, and then all of it again, just to get to a part, a tool, or whatever. On a multi day run( Like the Dixie) changing the propane tanks was even a hasle. I hope to eleviate a lot of this. Seeing your rig(Greg) at the Dixe Run, made me want to bob my tub even more than I had wanted to in the past. Being how it is only Leslie and I riding, there was really no need for the rear tub layout. Hmmm I just may be able th haul more "stuff" when I get it all completed!
This is hopefully the last big change it will under go for a long time. While I do enjoy creating and wrenching to a certain degree. I would much rather have it on the trail.
I hope to have it completed in time to maybe do some wheeling over Thanksgiving. If I could ride with the same group I rode with at the Dixie Run, I would be very happy. Never rode with a more capible group. We'll see
Finished welding in the back of the tub last night. I think it'll look good. Still, much much more to do,....until next update