In case he can't get the info forwarded to you here is the gist of it:
Friday: We will be doing prep work for Saturday. This includes hauling guard rail sections, and guard rail posts down the trail to where its needed. We also need to haul split rail fence, and install it. We will need a way to haul the bucket or auger depending on which one we are using at the time for the Bobcat. Also if we get time we may haul some of the rock to where its needed.
Saturday: Hauling wise Terry Savery has estimated 10 + loads of rock. We will need to haul the rock on the trails, plus the bobcat attachments. The attachments include the auger, hydraulic breaker, 4in1 combination bucket, plus 2 regular buckets. Of course 2 of these at any time will be on the bobcats, but that still leaves 3 to haul.
What I didn't include but is a given considering the work load:
-We will be installing guard rail
-We will be grading/dozing areas
-We will be breaking up rocks with the Hydraulic Breaker
-We will be using the Bobcats to remove broken bridges, and repair them
A lot of work to be done, but I think with enough prep work Friday we will be set.