Again here is the plan for the September work day based on what we know right now:
WORK LOAD:
We can be guaranteed there will be trash pick up, trail diamonds/markers to put up, and drainage ditches to shovel out.
The contractors should be done with at least Rocky Mountain Loop by the next work day. At that point they should be working on Falls Dam. There is a good chance we will be putting up guard rail on Rocky Mnt. Loop. But nothing has been confirmed yet.
SCHEDULE:
8AM - OUTPOST BREAKFAST
9AM - MEET AT HUNT CAMP
1PM - 1:30PM - LUNCH AT THE DOUBLE PARKING LOT
3PM - PENDING THE GROUP MORE TRAIL WORK AND/OR TRAIL RIDES
LODGING:
As always there will be free camping offered for the volunteers. There are Cabin rentals available in the area for those not interested in camping.
FUTURE/OTHER WORK:
Right now everything his hinging on what to contractors do/don't do to the trails. If we end up with a ton of guard railing to put up it will take away time from other possible work projects. We do need to set up an information tent/canopy for the October work day and possibly the November work day. So this will be something that we will be looking into.
Other stuff like road work, campground maintenance, parkinglot upkeep, etc is on the back burner till we know more about the immediate work load.
WORK LOAD:
We can be guaranteed there will be trash pick up, trail diamonds/markers to put up, and drainage ditches to shovel out.
The contractors should be done with at least Rocky Mountain Loop by the next work day. At that point they should be working on Falls Dam. There is a good chance we will be putting up guard rail on Rocky Mnt. Loop. But nothing has been confirmed yet.
SCHEDULE:
8AM - OUTPOST BREAKFAST
9AM - MEET AT HUNT CAMP
1PM - 1:30PM - LUNCH AT THE DOUBLE PARKING LOT
3PM - PENDING THE GROUP MORE TRAIL WORK AND/OR TRAIL RIDES
LODGING:
As always there will be free camping offered for the volunteers. There are Cabin rentals available in the area for those not interested in camping.
FUTURE/OTHER WORK:
Right now everything his hinging on what to contractors do/don't do to the trails. If we end up with a ton of guard railing to put up it will take away time from other possible work projects. We do need to set up an information tent/canopy for the October work day and possibly the November work day. So this will be something that we will be looking into.
Other stuff like road work, campground maintenance, parkinglot upkeep, etc is on the back burner till we know more about the immediate work load.