So how big is this and what kind of dirt cost were involved if you don't mind sharing. IF I ever get to this point I have a grade I have to level.
I'll get the bill for the dirt later today as long as its enough and more doesn't need to come tomorrow. I can share that cost later.
The shop is 60x60 6" thick slab
Front corner is at ground level back left needs to be brought up 2ft and the right side needs to be brought up 3ft. So far 7 loads of 15yds of sand rock with 5 more planned to come today.
 
I'll get the bill for the dirt later today as long as its enough and more doesn't need to come tomorrow. I can share that cost later.
The shop is 60x60 6" thick slab
Front corner is at ground level back left needs to be brought up 2ft and the right side needs to be brought up 3ft. So far 7 loads of 15yds of sand rock with 5 more planned to come today.
This would actually be really helpful to me. I'm fairly certain I have a 2' or more drop.
 