YotaOnRocks
Well-Known Member
- Joined
- Jul 17, 2007
- Location
- Madison
Duke Power needs an electrical load sheet to give me a qoute on running power to my barn. Engineer said it would be free if I was building the house first but the barn will cost
. Pisses me off because the engineer I dealt with in 2020 didn't care if I had permits for the house and didn't tell me it was their rules, now he retired and the new engineer is requiring them. The cost is $21,000 minuse however much credit I can get for the barn based off the load sheet. I have no idea how to fill the thing out. Any help or direction would be greatly appreciated.
Barn is 40x80x16. Will be running a fridge and deep freezer, oven/range, water heater, washing machine/dryer, 5 tonish heat pump, air compressor, welder, high bay led ufo lights, wall outlets, and my 50amp fifth wheel
Any other info needed just let me know.
. Pisses me off because the engineer I dealt with in 2020 didn't care if I had permits for the house and didn't tell me it was their rules, now he retired and the new engineer is requiring them. The cost is $21,000 minuse however much credit I can get for the barn based off the load sheet. I have no idea how to fill the thing out. Any help or direction would be greatly appreciated.Barn is 40x80x16. Will be running a fridge and deep freezer, oven/range, water heater, washing machine/dryer, 5 tonish heat pump, air compressor, welder, high bay led ufo lights, wall outlets, and my 50amp fifth wheel
Any other info needed just let me know.
Engineer told me like $14k credit for my house and it’s not a small one.