To make sure I’m doing my part right, why are the GC quotes I’m getting back for demo and construction so different?
I’ve called 3 GCs come come in and give me quotes on demo of two walls in my office and contstruction of an additional 2100sqft area of office.
This is a warehouse office space. Drywall and steel construction with drop ceiling. Open floor plan for the most part. A couple of 10x10 offices on adjacent walls. Tie in HVAC, and electrical. Leaving fire suppression off the quote until later when the engineer determines what’s needed.
First quote was $160k, second quote was $258k and the one I’m waiting on who gave me a ballpark of $80k plus HVAC. Using the HVAC from the other quotes would put him about $130k if his ballpark holds up.
I walked each of these guys through the work and explained the same thing.
What gives?
I’ve called 3 GCs come come in and give me quotes on demo of two walls in my office and contstruction of an additional 2100sqft area of office.
This is a warehouse office space. Drywall and steel construction with drop ceiling. Open floor plan for the most part. A couple of 10x10 offices on adjacent walls. Tie in HVAC, and electrical. Leaving fire suppression off the quote until later when the engineer determines what’s needed.
First quote was $160k, second quote was $258k and the one I’m waiting on who gave me a ballpark of $80k plus HVAC. Using the HVAC from the other quotes would put him about $130k if his ballpark holds up.
I walked each of these guys through the work and explained the same thing.
What gives?