CasterTroy
Faster'N You
- Joined
- Mar 21, 2005
- Location
- Wallburg
Always fun discussions about where to hang equipment and how I've got to remove all their joist bracing if they expect us to run duct above ceilings, and WHY do I have to penetrate their roofs with ROOFTOP EQUIPMENT!!Everyone is always fussing at the guy who engineers out building a about where he puts the tension rod things and wind girders
It's like every single job they forget that you have to heat and cool a building and provide a means to take a shit, as well as need more than 3" above a ceiling for lights and sprinkler, and duct, and conduit......
Every.single.job