Every project needs a title, I think this one fits.
Last night we all met up at the shop(Snappy,Marvilusone,redneckjeep87,Mike J.)
We started by scratching our heads..alot. But soon decided to start removing what was there of the floor. We also decided to remove the inner fender wells,seat, and alot of stuff we wont need.
Not much left to hold the Body together, so we scabbed in some bracing to temporarily hold it all together. We decided to go with 2x2 square tubing and started building up a new sub floor. This will also help tie in all the body panels. The plan is to build the sub floor and sheet it with aluminum airplane flooring(very strong and lite)
Tabb and Brett got to work on the engine, replacing the plugs,wires,dizzy,points,oil. We got it running like a champ. Probably gonna need another oil change after running it a little longer, and maybe a new carb gasket.
All in all it was a good start to the project. We will need more hands, so if you wanna work..let me know!