Yeah, I thought about that and you are most likely correct. ThanksYou could just pour footings where the posts will be and pour your slab later. That's how they did the last to buildings we built. They are large commercial buildings and aren't comparable cost wise. If you did it for a small building, I doubt it would save you hardly any money. The footings eat up a lot of concrete and they still have to have a machine out there to dig them and still have to have a few guys on site to pour them. I would think that you would only save the cost of the concrete on the pad. But that savings would be eaten up with extra labor costs (twice as many trips for the concrete crew).