Figures. We’re the number two data center contractor in the nation. High chance it’s one of ours.
Nice. We've done a several of these.
Figures. We’re the number two data center contractor in the nation. High chance it’s one of ours.
The government owned concrete block production facility has extra block, so you will use it. Any questions?So we have a park we are building in China. One of our guys was over checking site and shared progress picture of site and We all found it really odd how they are constructing the floor.
They poured a concrete pad (unsure the thickness), laid out all of the conduit, plumbing and whatnot that is in the floor. Then laid block around the conduit and plumbing. Next they lay wire grid and pour more concrete for the final floor.
View attachment 428418
That's probably the most legit explanation I've heard.The government owned concrete block production facility has extra block, so you will use it. Any questions?
Not to stir the pot further - but a lot of those concerns raised are the same for some - many - hybrid vehicles too.
Correct.Not to stir the pot further - but a lot of those concerns raised are the same for some - many - hybrid vehicles too.
Particularly those that are essentially electric but use a generator to recharge batteries.
So we have a park we are building in China. One of our guys was over checking site and shared progress picture of site and We all found it really odd how they are constructing the floor.
They poured a concrete pad (unsure the thickness), laid out all of the conduit, plumbing and whatnot that is in the floor. Then laid block around the conduit and plumbing. Next they lay wire grid and pour more concrete for the final floor.
View attachment 428418
oh yes.. we do!You’re the lego guy, right? Does no one see the irony in that and how the floor is being put together????
Saw that shared on the book of faces this morning. I agree I want it.
So we have a park we are building in China. One of our guys was over checking site and shared progress picture of site and We all found it really odd how they are constructing the floor.
They poured a concrete pad (unsure the thickness), laid out all of the conduit, plumbing and whatnot that is in the floor. Then laid block around the conduit and plumbing. Next they lay wire grid and pour more concrete for the final floor.
View attachment 428418
In manassas for a few days, and manassas battlefield park is right between the site and hotel. Had to stop and do a POTA activation.
View attachment 428353
Yessir. 20m and 40m off a 47' End Fed Random Wire. Made 11 in about an hour.HF?
How many contacts did you make?
Planning for repairs? Sounds like these engineers need to talk to vehicle engineers.Ive had this method explained to me by a engineer once - he said its so they can determine differentiate substrates if they need to dig down to make repairs
Fresh hay. William Wallace tested and approved. @CarolinaHD
For what it’s worth a Kubota L2501 handles a 5X5 roll of hay just fine with a chinese-a-wain hay spear off of Amazon lol
View attachment 428492
How does your buddy there see where he’s going?
Hows the hippie cow handle the hot southern summers??Fresh hay. William Wallace tested and approved. @CarolinaHD
For what it’s worth a Kubota L2501 handles a 5X5 roll of hay just fine with a chinese-a-wain hay spear off of Amazon lol
View attachment 428492
No issue at all. They have a good run out shelter surrounded by trees and several trees in the pasture to shack up under. The highland is a very versatile breed!Hows the hippie cow handle the hot southern summers??