Carolina Truggies JK Build

got the skid DONE painted/bolted up....also ordered e-brake cables from a 4 door for mine since we stretched it...got a butt load of grade 8's for the final bolt up of the suspension....lots of small shit done but we're gettin there

from the front
ai150.photobucket.com_albums_s107_fallenangel1006_511.jpg
 
That's some nice looking work.
 
update: got the Front drive shaft at the shop yesterday...next week should be a big week for the Jeep, we will have brakes done and hopefully the hydraulic lines for the steering done as well. Now that the drive shaft is here he will be able to fill in the floor board and fully weld under the driver seat and mount it. Then we can wire everything up on the inside. Next on the list will be finishing the fuel cell then tube fenders and rock sliders...getting close!

Don't know if any of the local Jeepers are interested but the first thing we're taking her to will be Jeep Beach 2010 in Daytona Beach FL. on May 14-16 should be a blast :D...and then I'll be at 4x4CROSS in URE
 
update: got the Front drive shaft at the shop yesterday...next week should be a big week for the Jeep, we will have brakes done and hopefully the hydraulic lines for the steering done as well. Now that the drive shaft is here he will be able to fill in the floor board and fully weld under the driver seat and mount it. Then we can wire everything up on the inside. Next on the list will be finishing the fuel cell then tube fenders and rock sliders...getting close!
Don't know if any of the local Jeepers are interested but the first thing we're taking her to will be Jeep Beach 2010 in Daytona Beach FL. on May 14-16 should be a blast :D...and then I'll be at 4x4CROSS in URE

Are you gonna drive it down there? Have a good time and enjoy your rig dude:bling:
 
I haven't scene these light up in quite a while
ai150.photobucket.com_albums_s107_fallenangel1006_545.jpg

SPARE TIRE WILL NOT BE MOUNTED HERE...JUST THERE FOR THE WEIGHT TO ADJUST THE COILOVERS
Custom fuel cell done, coilovers filled with nitrogen, brakes done, hydraulic lines started, ebrakes fabed, final paint applied, floor board filled in, front and rear driveshafts installed, ORO Rock lites wired, tail lights/turn signals wired, most of the sound system installed....etc etc....we need to be running by the end of next week
ai150.photobucket.com_albums_s107_fallenangel1006_528.jpg

ai150.photobucket.com_albums_s107_fallenangel1006_529.jpg

ai150.photobucket.com_albums_s107_fallenangel1006_533.jpg

ai150.photobucket.com_albums_s107_fallenangel1006_534_1.jpg

ai150.photobucket.com_albums_s107_fallenangel1006_544.jpg

ai150.photobucket.com_albums_s107_fallenangel1006_538.jpg

ai150.photobucket.com_albums_s107_fallenangel1006_537.jpg

ai150.photobucket.com_albums_s107_fallenangel1006_539.jpg

ai150.photobucket.com_albums_s107_fallenangel1006_541.jpg

ai150.photobucket.com_albums_s107_fallenangel1006_542.jpg

ai150.photobucket.com_albums_s107_fallenangel1006_543.jpg

ai150.photobucket.com_albums_s107_fallenangel1006_520.jpg
 
Does Daytona have sweet wheelin spots?

No. FL has mud sand and more mud. Most of the mud is under 2' of water. I'd go to URE or Harlan before I'd drive to FL with that thing. :shaking:
 
Yeah this is cool and all i guess, but mine has 4 cylinders.




Looks great guys, ill be stopping by soon to make sure i see it one last time before it rolls out.
 
No. FL has mud sand and more mud. Most of the mud is under 2' of water. I'd go to URE or Harlan before I'd drive to FL with that thing. :shaking:

not going for wheeling...just a show and shine and obstacle coarse in the infield at Daytona Speedway, then some beach cruising...all I'm looking for at the moment anyways seeing as nothing will be broke in...after that we'll be at URE, Harlen, Moab etc etc. :beer:
 
Back
Top