mcutler
Well-Known Member
- Joined
- Apr 17, 2010
- Location
- mt.airy nc
Got started on the hidden steps today, and the rub rail is tacked on. Once I get the passenger side to this point I will raise the cab for the last time. Then the rails will get completed, (cause I hate lying on my back to work...), and the remainder of the areas of the cab that need final prep will be addressed. Once the cab is back down, tubing will commence.
Matt
Matt