i actually have some updates. the last few weeks on this have went wrong in just about every way you could think of. i lost parts, cant find parts, found out "upgradeed" parts i bought were a waste of time money and effort. 3 electric fuel pumps all needed rebuild from just setting, stuck on what to do, 7 trips to advance auto for correct belts, and fed ex sucks lol... but isnt that some percent of the fun??
radiator support in rad mounted, fuel lines plumbed, most of the coolant system plumbed..
and another pic of the start of my doubler cage/x-member..
AND FOR THE BOAT SIDE TIPS, LEAVE THE FRONT CLIP ON IT TO HELP SUPPORT THE CAB....BAD THINGS HAPPEN IF YOU DONT HAHAHA....
some cross member pics, one day ill figure out how to do this shit the right way and not take forever..... i plan to add more to it to tie the doubler together, but the the Uwharrie trip is in two weeks
i really need to get the truck done and wire in my 3 phase converter so i can actually use that dang thing. you should she the pics of the hatch back with some of the things i have strapped to that roof rack...
headlights are going to shine from behind the rad support. working on winch mount and bumper now. one day ill get to putting my locker in. i rather do the fun stuff for a lil while