jcramsey
Well-Known Member
- Joined
- Jul 22, 2009
- Location
- Marion, NC
I concur, and with the lift it leveraged things and and looks like the steering rack got yanked out too
Guess I know what I’m gonna be checking on my 3rd gen tomorrow...
I concur, and with the lift it leveraged things and and looks like the steering rack got yanked out too
I just bought the 5th tire like 6 months ago. I was planning on getting 3 more mtr's but ended up getting a deal on the km3's.You haven't been rotating the Fifth tire! Smart to just buy 4!
A friend of mine had a brother that was sent there back in the 70's for stealing hogs.He said he took their mom to visit him once a month since she didnt drive.Took three hours each way in a 1600 pinto station wagon on two lane roads.Had a good trip
Sent from my SM-G955U using Tapatalk
Yeah, this is memeworthy!I figured she was telling our governor where he can go.
It is Hickory after dark.them tires look bald as cue ball.
Big truck have done it for years. You can buy them molded for that purpose. On big rears you just park a cut down pan in the wheel.Last time a wrecker towed my dump truck, he did that too!
this is what I need for my A-1 build!!
I mean, if you really just want to make a cage heavier with zero benefit....
I'm thinking it's more like a walk-thru bidet.
I think you'd hate being the plumber more. Most of this has to come back out because it's 3" and I call for 4"I'd hate to be the floor finisher!
I'm thinking the reaction of the plumber would be something likeI think you'd hate being the plumber more. Most of this has to come back out because it's 3" and I call for 4"
No crap...and I hate BEING that guy to them! But when the plans, specs, and 3 different details specifically outline 4" individual connections to the branch, and you install 3" stack san tee's into a 3" combo when it should have been a flat 4" combo into a 4" branch... 48 times.....well, shit's on you to readSucks donkey balls to be that guy!
Yeah.... admittedly, it does suck to be that guy too, to tell them "hey, shithead (maybe/maybe not with that just YET), was reading comprehension not your strong suit?" but me thinks that the poor sap that quoted the job is going to get an earful....or an assful....No crap...and I hate BEING that guy to them! But when the plans, specs, and 3 different details specifically outline 4" individual connections to the branch, and you install 3" stack san tee's into a 3" combo when it should have been a flat 4" combo into a 4" branch... 48 times.....well, shit's on you to read
There's a reason these guys were $54k LOW on this job